Prequalification of turnkey delivery for electric boiler to Suomenoja power plant

Fortum Power and Heat Oy · Uusimaa

Perustiedot

Tarjousten määräaika
ti 7.12.2021 klo 12.00 (päättynyt)
Hankkija
Fortum Power and Heat Oy, Y-tunnus 0109160-2
Toteutuspaikka
Uusimaa (FI1B1)
Hankintalaji
Tarvikkeet ja laitteet (tavarahankinta)
Menettely
EU-hankinta
Ilmoituksen tyyppi
Hankintailmoitus – Erityisalat
Arvioitu kokonaisarvo
Ei ilmoitettu
Pääasiallinen CPV
42160000 Kattilalaitteistot
Julkaistu
14.11.2021

Ammattiala

LVI

Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.

Ilmoituksen teksti

Alkuperäinen teksti Hilmasta, muuttamattomana
With this request, Fortum Power and Heat Oy wishes to obtain a turnkey delivery for an agreement for the supply of a appox. 50MW new electrode boiler with an associated expansion system, boiler circuit pump, control valves and heat exchanger for Suomenoja heat production facility. The scope will include complete design, engineering, manufacturing, installation, commissioning and training of the Purchaser’s operating and maintenance personnel. General plant and process design and engineering as well as civil works, needed piping, electrification, instrumentation and automation works outside the electrode boiler delivery scope are in the Purchaser's responsibility. The boiler will be installed into existing power plant building. Taking over of the plant will take place in fall 2022.

Erän kuvaus

Scope will include a turnkey delivery for an agreement for the supply of a approx. 50MW new electrode boiler with an associated expansion system, boiler circuit pump, control valves and heat exchanger for Suomenoja heat production facility. The scope will include complete design, engineering, manufacturing, installation, commissioning and training of the Purchaser’s operating and maintenance personnel. General plant and process design and engineering as well as civil works, needed piping, electrification, instrumentation and automation works outside the electrode boiler delivery scope are in the Purchaser's responsibility. The boiler will be installed into existing power plant building. Taking over of the plant will take place in fall 2022.

Hankinnan vaiheet

  1. Hankintailmoitustämä ilmoitus

    Tarjouspyyntö julkaistiin, määräaika 7.12.2021 klo 12.00.

  2. TulevaJälki-ilmoitus

    Ei vielä julkaistu.

Hankkijan aiemmat LVI-alan tarvikehankinnat

Fortum Power and Heat Oy: kaikki hankinnat

Ei jälki-ilmoituksia viimeisen 36 kuukauden ajalta.

Lähde: Hilma (hankintailmoitukset.fi)

Ilmoitus 2021-086102

Ilmoita virheestä tai pyydä poistoa