Prequalification of turnkey delivery for electric boiler to Suomenoja power plant
Fortum Power and Heat Oy · Uusimaa
Perustiedot
- Tarjousten määräaika
- ti 7.12.2021 klo 12.00 (päättynyt)
- Hankkija
- Fortum Power and Heat Oy, Y-tunnus 0109160-2
- Toteutuspaikka
- Uusimaa (FI1B1)
- Hankintalaji
- Tarvikkeet ja laitteet (tavarahankinta)
- Menettely
- EU-hankinta
- Ilmoituksen tyyppi
- Hankintailmoitus – Erityisalat
- Arvioitu kokonaisarvo
- Ei ilmoitettu
- Pääasiallinen CPV
- 42160000 Kattilalaitteistot
- Julkaistu
- 14.11.2021
Ammattiala
LVI
Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.
Ilmoituksen teksti
Alkuperäinen teksti Hilmasta, muuttamattomanaWith this request, Fortum Power and Heat Oy wishes to obtain a turnkey delivery for an agreement for the supply of a appox. 50MW new electrode boiler with an associated expansion system, boiler circuit pump, control valves and heat exchanger for Suomenoja heat production facility. The scope will include complete design, engineering, manufacturing, installation, commissioning and training of the Purchaser’s operating and maintenance personnel. General plant and process design and engineering as well as civil works, needed piping, electrification, instrumentation and automation works outside the electrode boiler delivery scope are in the Purchaser's responsibility. The boiler will be installed into existing power plant building. Taking over of the plant will take place in fall 2022.
Erän kuvaus
Scope will include a turnkey delivery for an agreement for the supply of a approx. 50MW new electrode boiler with an associated expansion system, boiler circuit pump, control valves and heat exchanger for Suomenoja heat production facility. The scope will include complete design, engineering, manufacturing, installation, commissioning and training of the Purchaser’s operating and maintenance personnel. General plant and process design and engineering as well as civil works, needed piping, electrification, instrumentation and automation works outside the electrode boiler delivery scope are in the Purchaser's responsibility. The boiler will be installed into existing power plant building. Taking over of the plant will take place in fall 2022.
Hankinnan vaiheet
-
Hankintailmoitustämä ilmoitus
Tarjouspyyntö julkaistiin, määräaika 7.12.2021 klo 12.00.
-
TulevaJälki-ilmoitus
Ei vielä julkaistu.
Hankkijan aiemmat LVI-alan tarvikehankinnat
Fortum Power and Heat Oy: kaikki hankinnatEi jälki-ilmoituksia viimeisen 36 kuukauden ajalta.