Määräaika päättynyt EU-hankintaKorjattu 6.10.2023 SähköTarvikkeet

20 kV 63 MVAR Ester Oil filled Shunt Reactor

Fingrid Oyj · koko Suomi

Perustiedot

Tarjousten määräaika
ma 16.10.2023 klo 13.00 (päättynyt)
Hankkija
Fingrid Oyj, Y-tunnus 1072894-3
Toteutuspaikka
koko Suomi
Main Delivery: Substation in Länsisalmi. Optional Delivery: to be confirmed.
Hankintalaji
Tarvikkeet ja laitteet (tavarahankinta)
Menettely
EU-hankinta
Ilmoituksen tyyppi
Hankintailmoitus – Erityisalat
Arvioitu kokonaisarvo
Ei ilmoitettu
Pääasiallinen CPV
31000000 Sähkökoneet, -kojeet, -laitteet ja -kulutustarvikkeet; valaistus
Julkaistu
6.10.2023
Korjausilmoitus

Ammattiala

Sähkö

Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.

Ilmoituksen teksti

Alkuperäinen teksti Hilmasta, muuttamattomana
This procurement consists of a so called turnkey delivery of one (1) Ester oil filled 20 kV 63 MVAR Shunt Reactor ("Main Delivery") for Länsisalmi substation. As an option one (1) Ester oil filled 20 kV 63 MVAR Shunt Reactor.

Erän kuvaus

GENERAL Fingrid Oyj, the Finnish national transmission system operator, is initiating this procurement process for one (1) 20 kV 63 MVar Ester oil filled shunt reactor with the intended preliminary delivery time in October 2025 for Länsisalmi substation in Finland. Fingrid is working in close cooperation with the City of Helsinki and Helen Electricity Network to construct Finland’s first 400 kV cable link in the main grid. More information https://www.fingrid.fi/en/grid/construction/power-cable-Helsinki/ With this invitation to participate Fingrid is looking for capable and interested candidates to provide the needed shunt reactors. In our operating model, the network of services and good suppliers as well as good co-operation between different contractual partners are especially important. We require all our contractual partners to be aware of Fingrid’s significant duties as responsible transmission system operator in Finland and to commit to responsibility of the economic, social and environmental impact of their operations. The delivery of reactor, including all needed transportation and erections, will be performed as turnkey deliveries. The reactor delivery will be separate from the substation construction projects performed by other contractors, however, there is a need to coordinate the delivery of reactor with the construction work at site. DELIVERY Delivery of one 20 kV, 63 MVar shunt reactor including: - Manufacturing of reactor with fittings and accessories - Testing, - Sea transportation to Finland, - Transport to the site in Finland. The Supplier may choose the means and route of transportation. - Unloading on the foundation, erection, testing and commissioning at site. - All organizational work needed for logistics: arrangement of transportation from factory to site, customs clearance and forwarding Preliminary 20 kV, 63 MVAr Shunt Reactor specification is attached to this prequalification (see attachment 01 PRELIMINARY S223XXE1 Ester Oil filled 63 MVAr reactor). Detailed schedules shall be given at a later stage of the procedure. PRELIMINARY SCHEDULE OF THE PROCUREMENT Fingrid will use the negotiated procedure for this procurement of shunt reactor. The negotiated procedure will tentatively go as follows. Fingrid, however, reserve all rights to revise and edit the schedule during the process. INVITATION TO PARTICIPATE This Invitation to Participate has been launched 09/2023 Application to Participate: Deadline to provide Application see IV.2.2. APPLICATIONS AND THEIR EVALUATION All candidates, who have submitted the application within the set deadline and who meet the minimum requirements set for the candidate’s eligibility will be selected to the negotiated procedure. NEGOTIATIONS Negotiations with all selected candidates will take place tentatively during October. Invitations to negotiations will be sent out when to the selected candidates when the PQ-phase has ended. Negotiations will most probably be held through teams-application or similar conference call program. FINAL CALL FOR TENDER When the negotiations phase has ended, Fingrid will launch the final call for tender. EVALUATION OF FINAL TENDERS AND CONTRACT AWARD DURING 2023. 1 week extension due to original schedule being too tight

Muutoksen kuvaus

1 week extension due to original schedule being too tight

Hankinnan vaiheet

  1. –Hankintailmoitus

    Aiempi versio. Sen tiedot eivät ole Urakkahaussa.

  2. Muutosilmoitustämä ilmoitus

    Korjausilmoitus.

  3. TulevaJälki-ilmoitus

    Ei vielä julkaistu.

Hankkijan aiemmat sähköalan tarvikehankinnat

Fingrid Oyj: kaikki hankinnat
Julkaistu Hankinta Voittaja Sopimusarvo Tarjouksia
ratkaistu 9.6.2026 TM83 ELK-3 420kV GIS mid-life service Hitachi Energy Finland Oy 810 000 € 1
TM83 ELK-3 420kV GIS mid-life service Aiottu toimittaja: Hitachi Energy Finland ei ilmoitettu ei ilmoitettu
ratkaistu 30.3.2026 MUU10 400 kV 400 MVA Power Transformers 2029-2032 2nd Frame Hitachi Energy Finland Oy 51 282 000 € 1
ratkaistu 13.1.2026 400 kV 400 MVA Power Transformers 2029-2032 HYOSUNG HEAVY INDUSTRIES CORPORATION 48 060 292 € 7
ratkaistu 18.12.2025 Spare Parts Nexans Norway AS 25 000 000 € 1

”Ei ilmoitettu” tarkoittaa, ettei ilmoituksessa ole tätä tietoa erälle tai sopimukselle; hankinnan kokonaisarvo voi silti näkyä ilmoituksen sivulla. Puitesopimuksissa arvo on enimmäisarvo.

Lähde: Hilma (hankintailmoitukset.fi)

Ilmoitus 2023-137825

Ilmoita virheestä tai pyydä poistoa