Ratkaistu EU-hankinta SähköTarvikkeet

Medium Voltage Switchgear and Busbar

Helen Ltd · alue ei tiedossa

Perustiedot

Osallistumishakemusten määräaika
ti 6.2.2024 klo 12.00 (päättynyt)
Kysymysten määräaika
ma 29.1.2024 klo 12.00 (päättynyt)
Hankkija
Helen Ltd, Y-tunnus 2630573-4
Toteutuspaikka
alue ei tiedossa
Hankintalaji
Tarvikkeet ja laitteet (tavarahankinta)
Menettely
Neuvottelumenettely, EU-hankinta
Ilmoituksen tyyppi
Hankintailmoitus – Erityisalat
Arvioitu kokonaisarvo
Ei ilmoitettu
Erät
3 erää
Pääasiallinen CPV
31200000 Sähkönjakelu- ja ohjauslaitteet
Julkaistu
24.1.2024

Erät ammattialoittain

  • Sähkö: Kaikki erät

Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.

Ilmoituksen teksti

Alkuperäinen teksti Hilmasta, muuttamattomana
Helen Ltd ("The Client" or "The Contracting unit") aims to be carbon neutral energy company by 2030. In order to achieve its carbon neutrality targets, Helen is currently seeking to increase non-combustion-based energy solutions for its energy production. In this procurement The Contracting unit is seeking 1-2 suppliers for medium voltage switchgear and busbar, preliminary to two different production locations in Helsinki area, Finland, as described in this EU Procurement Notification and its Annexes. The main driver for electrode boiler investments is to increase the capacity of non-fossil-based district heat production. The Contracting unit will make a separate project execution decision for both projects, Hanasaari (A1), and Patola (A2). The procurement consists of 2 parts, which may be quoted as follows: ALTERNATIVE A (parts quoted separately): A1. 10kV switchgears and busbars for Hanasaari production site for approximately 220 MW capacity A2. 10kV switchgears and busbars for Patola production site for approximately 140 MW capacity ALTERNATIVE B (combination of parts mentioned in the alternative A): Alternative B allows Tenderer to take synergy advantages into consideration and give more competitive pricing for bigger entity i.e., both projects. The Candidate may send the application to tender for part A1 and part A2. The Candidate may send the application for Alternative B but must then apply and tender for same parts separately (Alternative A) as well. The Supplier or Suppliers will be chosen based on the final evaluation. The economically most advantageous quotation or combination of the quotations will be chosen. Preliminary grounds for decision are described in the preliminary project description.

Erien kuvaukset

Erä 1: A1. Hanasaari production site
Helen Ltd is planning to increase its carbon neutral DH production in Hanasaari production site with total capacity of ~220MW. Part A1 includes 100% of the total capacity for Hanasaari project. The medium voltage switchgear and busbar will be installed to a new building in Hanasaari production site. The delivery includes switchgear and busbar designed, manufactured, delivered, installed, and commissioned to Hanasaari, Helsinki. The commissioning of the switchgear and busbar will take place after necessary electricity and automation installations are ready, according to the present schedule in 1-6/2026. The electric boiler units are planned to be in commercial operation by 6-9/2026. The schedule is preliminary and subject to change.
Erä 2: A2. Patola production site
Helen Ltd is planning to increase its carbon neutral DH production in Patola production site with total capacity of ~140MW. Part A2 includes 100% of the total capacity for Patola project. The main transformers will be installed to a new building in Patola production site. The delivery includes medium voltage switchgear and busbar designed, manufactured, delivered, installed, and commissioned to Patola, Helsinki. The commissioning of the switchgear and busbar will take place after necessary electricity and automation in-stallations are ready, according to the present schedule in 1-6/2026. The electric boiler units are planned to be in commercial operation by 6-9/2026. The schedule is preliminary and subject to change.
Erä 3: B. Combination of lots A1 and A2
Lot B allows Candidate to take synergy advantages into consideration and give more competitive pricing for bigger entity i.e., both projects. The Candidate may send the application to tender for part A1 and part A2. The Tenderer candidate may send the application for Lot B but must then apply and tender for same parts separately (Lots A1 and A2) as well.

Erät

Erä Nimi Ammattiala Arvioitu arvo CPV
1 A1. Hanasaari production site Keskeytetty Sähkö – 31200000
2 A2. Patola production site Keskeytetty Sähkö – 31200000
3 B. Combination of lots A1 and A2 Ratkaistu Sähkö – 31200000

Hankinnan vaiheet

  1. Hankintailmoitustämä ilmoitus

    Osallistumishakemuksia pyydettiin, määräaika 6.2.2024 klo 12.00.

  2. Jälki-ilmoitus

    Voittaja: Siemens Osakeyhtiö.

  3. Sopimusmuutos

    Sopimusta muutettiin.

Hankkijan aiemmat sähköalan tarvikehankinnat

Helen Ltd: kaikki hankinnat
Julkaistu Hankinta Voittaja Sopimusarvo Tarjouksia
ratkaistu 28.11.2025 JÄLKI-ILMOITUS Helen Oy - Salmisaaren sähkönjakelun muutokset - 10 kV kojeistot ja jakelumuuntajat ABB Oy 676 056 € ei ilmoitettu
ratkaistu 28.10.2025 JÄLKI-ILMOITUS Helen Oy:n Patolan sähkökattila- ja ilmavesilämpöpumppulaitos - Säätöventtiilit Valmet Flow Control Oy 499 100 € ei ilmoitettu
ratkaistu 3.7.2025 Hanasaari (HaC) Sähkökattilalaitos, Automaatiojärjestelmä sis. suunnittelun Valmet Automation Oy 369 000 € ei ilmoitettu
ratkaistu 27.12.2024 Ennakkoilmoitus suorahankinnasta / Hanasaaren ja Salmisaaren muuntajien aktiiviosien uusinta ja tehonnosto Aiottu toimittaja: Hitachi Energy Finland Oy ei ilmoitettu ei ilmoitettu
ratkaistu 30.9.2024 Katri Valan lämpöpumppulaitoksen tehonnosto, Taajuusmuuttajat / sähköistys VEO Oy ei ilmoitettu ei ilmoitettu

”Ei ilmoitettu” tarkoittaa, ettei ilmoituksessa ole tätä tietoa erälle tai sopimukselle; hankinnan kokonaisarvo voi silti näkyä ilmoituksen sivulla. Puitesopimuksissa arvo on enimmäisarvo.

Lähde: Hilma (hankintailmoitukset.fi)

Ilmoitus 2024-004534

Ilmoita virheestä tai pyydä poistoa