High Voltage Main Transformers
Helen Oy · alue ei tiedossa
Perustiedot
- Osallistumishakemusten määräaika
- ti 6.2.2024 klo 12.00 (päättynyt)
- Kysymysten määräaika
- ma 29.1.2024 klo 12.00 (päättynyt)
- Hankkija
- Helen Oy, Y-tunnus 2630573-4
- Toteutuspaikka
- alue ei tiedossa
- Hankintalaji
- Tarvikkeet ja laitteet (tavarahankinta)
- Menettely
- Neuvottelumenettely, EU-hankinta
- Ilmoituksen tyyppi
- Hankintailmoitus – Erityisalat
- Arvioitu kokonaisarvo
- Ei ilmoitettu
- Erät
- 4 erää
- Pääasiallinen CPV
- 31170000 Muuntajat
- Sopimuskausi
- 3.6.2024–31.10.2026
- Julkaistu
- 23.1.2024
Erät ammattialoittain
- Sähkö: Kaikki erät
Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.
Ilmoituksen teksti
Alkuperäinen teksti Hilmasta, muuttamattomanaHelen Ltd ("The Client" or "The Contracting unit") aims to be carbon neutral energy company by 2030. In order to achieve its carbon neutrality targets, Helen is currently seeking to increase non-combustion-based energy solutions for its energy production. In this procurement The Contracting unit is seeking 1-3 suppliers for high voltage main transformers, preliminary to two different production locations in Helsinki area, Finland, as described in this EU Procurement Notification and its Annexes. The main driver for electrode boiler investments is to increase the capacity of non-fossil-based district heat production. The Contracting unit will make a separate project execution decision for .for Hanasaari and Patola projects. Hanasaari project consist two main transformers (A1, and A2) which shall have identical technical characteristics. Patola project consist one (1) main transformer that have its own technical characteristics. The procurement consists of 3 parts, which may be quoted as follows: ALTERNATIVE A (parts quoted separately): A1. HaCa1 Hanasaari production site, 1 X ~110 MVA main transformer A2. HaCa2 Hanasaari production site, 1 X ~110 MVA main transformer A3. Patola production site, 1 X ~140 MVA main transformer ALTERNATIVE B (combination of parts mentioned in the alternative A): Alternative B allows Candidate to take synergy advantages into consideration and give more competitive pricing for bigger entity (2-3 transformer). The Candidate may send the application to tender for part A1, A2 and/or part A3. The Candidate may send the application for Alternative B but must then apply and tender for same parts separately (Alternative A) as well. The Supplier or Suppliers will be chosen based on the final evaluation. The economically most advantageous quotation or combination of the quotations will be chosen. Preliminary grounds for decision are described in the preliminary project description.
Erien kuvaukset
Erä 1: A1. HaCa1 Hanasaari production site, 1 X ~110 MVA main transformer
Helen Ltd is planning to increase its carbon neutral DH production in Hanasaari production site with total capacity of ~200MW. Part A1 includes 50% of the total transformer capacity for Hanasaari project. The main transformers will be installed to a new building in Hanasaari production site. The delivery includes main transformers designed, manufactured, delivered, installed, and commissioned to Hanasaari, Helsinki. The commissioning of the main transformers will take place after necessary electricity and automation installations are ready, according to the present schedule in 1-6/2026. The electric boiler units are planned to be in commercial operation by 6-9/2026. The schedule is preliminary and subject to change.
Erä 2: A3. Patola production site, 1 X ~140 MVA main transformer
Helen Ltd is planning to increase its carbon neutral DH production in Patola production site with total capacity of approximately 120MW. Part A3 includes 100% of the total transformer capacity for Patola project. The main transformers will be installed to a new building in Patola production site. The delivery includes main transformers designed, manufactured, delivered, installed, and commissioned to Patola, Helsinki. The commissioning of the main transformers will take place after necessary electricity and automation installations are ready, according to the present schedule in 1-6/2026. The electric boiler units are planned to be in commercial operation by 6-9/2026. The schedule is preliminary and subject to change.
Erä 3: B. Combination of lots A1-A3
Lot B Combination of parts mentioned in the alternative A allows Candidate to take synergy advantages into consideration and give more competitive pricing for bigger entity (2-3 transformer). The Candidate may send the application for lot B1 but must then apply for lot A1 and/or A2 and/or A3 as well.
Erä 4: A2. HaCa2 Hanasaari production site, 1 X ~110 MVA main transformer
Helen Ltd is planning to increase its carbon neutral DH production in Hanasaari production site with total capacity of ~200MW. Part A1 includes 50% of the total transformer capacity for Hanasaari project. The main transformers will be installed to a new building in Hanasaari production site. The delivery includes main transformers designed, manufactured, delivered, installed, and commissioned to Hanasaari, Helsinki. The commissioning of the main transformers will take place after necessary electricity and automation installations are ready, according to the present schedule in 1-6/2026. The electric boiler units are planned to be in commercial operation by 6-9/2026. The schedule is preliminary and subject to change.
Erät
| Erä | Nimi | Ammattiala | Arvioitu arvo | CPV |
|---|---|---|---|---|
| 1 | A1. HaCa1 Hanasaari production site, 1 X ~110 MVA main transformer | Sähkö | – | 31170000 |
| 2 | A3. Patola production site, 1 X ~140 MVA main transformer | Sähkö | – | 31170000 |
| 3 | B. Combination of lots A1-A3 | Sähkö | – | 31170000 |
| 4 | A2. HaCa2 Hanasaari production site, 1 X ~110 MVA main transformer | Sähkö | – | 31170000 |
Hankinnan vaiheet
-
Hankintailmoitustämä ilmoitus
Osallistumishakemuksia pyydettiin, määräaika 6.2.2024 klo 12.00.
-
TulevaJälki-ilmoitus
Ei vielä julkaistu.
Hankkijan aiemmat sähköalan tarvikehankinnat
Helen Oy: kaikki hankinnat| Julkaistu | Hankinta | Voittaja | Sopimusarvo | Tarjouksia |
|---|---|---|---|---|
| ratkaistu 28.11.2025 | JÄLKI-ILMOITUS Helen Oy - Salmisaaren sähkönjakelun muutokset - 10 kV kojeistot ja jakelumuuntajat | ABB Oy | 676 056 € | ei ilmoitettu |
| ratkaistu 28.10.2025 | JÄLKI-ILMOITUS Helen Oy:n Patolan sähkökattila- ja ilmavesilämpöpumppulaitos - Säätöventtiilit | Valmet Flow Control Oy | 499 100 € | ei ilmoitettu |
| ratkaistu 3.7.2025 | Hanasaari (HaC) Sähkökattilalaitos, Automaatiojärjestelmä sis. suunnittelun | Valmet Automation Oy | 369 000 € | ei ilmoitettu |
| ratkaistu 3.6.2025 | Medium Voltage Switchgear and Busbar B. Combination of lots A1 and A2 | Siemens Osakeyhtiö | ei ilmoitettu | 2 |
| ratkaistu 27.12.2024 | Ennakkoilmoitus suorahankinnasta / Hanasaaren ja Salmisaaren muuntajien aktiiviosien uusinta ja tehonnosto | Aiottu toimittaja: Hitachi Energy Finland Oy | ei ilmoitettu | ei ilmoitettu |
”Ei ilmoitettu” tarkoittaa, ettei ilmoituksessa ole tätä tietoa erälle tai sopimukselle; hankinnan kokonaisarvo voi silti näkyä ilmoituksen sivulla. Puitesopimuksissa arvo on enimmäisarvo.