Perustiedot

Osallistumishakemusten määräaika
pe 19.1.2024 klo 12.00 (päättynyt)
Kysymysten määräaika
pe 12.1.2024 klo 16.00 (päättynyt)
Hankkija
Helen Ltd, Y-tunnus 2630573-4
Toteutuspaikka
alue ei tiedossa
Hankintalaji
Tarvikkeet ja laitteet (tavarahankinta)
Menettely
Neuvottelumenettely, EU-hankinta
Ilmoituksen tyyppi
Hankintailmoitus – Erityisalat
Arvioitu kokonaisarvo
Ei ilmoitettu
Erät
2 erää
Pääasiallinen CPV
42160000 Kattilalaitteistot
Lisäkoodit: 45331110
Sopimuskausi
31.5.2024–30.6.2026
Julkaistu
24.12.2023

Erät ammattialoittain

  • LVI: Kaikki erät

Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.

Ilmoituksen teksti

Alkuperäinen teksti Hilmasta, muuttamattomana
Helen Ltd ("The Client" or "The Contracting unit") aims to be carbon neutral energy company by 2030. In order to achieve its carbon neutrality targets, Helen is currently seeking and piloting non-combustion based energy solutions for its energy production. In this procurement The Contracting unit is seeking 1-2 suppliers for industrial electrode hot water boilers, preliminary to one or two different production locations in Helsinki area, Finland, as described in this EU Procurement Notification and its Annexes. The main driver for electrode boiler investments is to increase the capacity of non-fossil based district heat production. The Contracting unit will make a separate project execution decision for both parts (A1&A2). The procurement consists of 2 parts, which may be quoted as follows: ALTERNATIVE A (parts quoted separately): A1. Hanasaari production site, 4 X ~50 MW electrode hot water boilers, supply voltage 10kV A2. OPTION Patola production site, 2 x ~50 MW electrode hot water boilers, supply voltage 10kV ALTERNATIVE B (both parts mentioned in the alternative A): Alternative B allows Tenderer to take synergy advantages into consideration and give more competitive pricing for bigger entity (2 parts). The Tenderer candidate may send the application to tender for part A1, and/or part A2. The Tenderer candidate may send the application for Alternative B but must then apply and tender for both parts (A1 and A2) separately as well. The Supplier or Suppliers will be chosen based on the final evaluation. The economically most advantageous quotation or combination of the quotations will be chosen. A preliminary schedule (estimates, subject to changes) for this procurement is: EU Procurement Notification: ~12/2023 - 1/2024 Decision on Tenderers: ~1/2024 Invitation to Initial Tender: ~2/2024 Submission of Initial Tender: ~3/2024 Negotiations rounds: ~3/2024 Invitation to Final Tender: ~3-4/2024 Submission of Final Tender: ~4/2024 Decision on the awarded Supplier: ~5/2024 This procurement will be executed as negotiated procedure.

Erien kuvaukset

Erä 1: A1 Hanasaari production site industrial electrode hot water boilers
Helen Ltd is planning to increase its carbon neutral DH production in Hanasaari production site with total capacity of ~200MW. Part A1 consist of 4 X 50 MW electrode hot water boilers. The Electrode hot water boiler units will be installed to a new building in Hanasaari production site. The delivery includes complete electrode hot water boiler units designed, manufactured, delivered, installed and commissioned to Hanasaari, Helsinki. The preliminary scope of supply is described in the initial RFT and in its Annexes. The commissioning of the electric boiler unit will take place after all of the process pipeline, electricity and automation installations are ready, according to the present schedule in 1/2026. The electric boiler units are planned to be in commercial operation by 6/2026. The schedule is preliminary and subject to change.
Erä 2: A2 OPTION Patola production site electrode hot water boilers
Helen Ltd is planning to increase carbon neutral DH production with 2 X 50 MW electrode boiler unit installed to Patola production facilities. The delivery includes complete electrode hot water boiler unit designed, manufactured, delivered, installed and commissioned to Patola, Helsinki. The preliminary scope of supply is described in the initial RFT and in its Annexes. The boiler unit and auxiliary systems must be erected in an extend that it can be connected to the Client's process pipelines, according to the present schedule in 1/2026. The electric boiler unit are planned to be in commercial operation by 6/2026. The schedule is preliminary and subject to change. Part A2 shall be considered as an option, but can be quoted singly.

Erät

Erä Nimi Ammattiala Arvioitu arvo CPV
1 A1 Hanasaari production site industrial electrode hot water boilers LVI – 42160000, 45331110
2 A2 OPTION Patola production site electrode hot water boilers LVI – 42160000, 45331110

Hankinnan vaiheet

  1. Hankintailmoitustämä ilmoitus

    Osallistumishakemuksia pyydettiin, määräaika 19.1.2024 klo 12.00.

  2. TulevaJälki-ilmoitus

    Ei vielä julkaistu.

Hankkijan aiemmat LVI-alan tarvikehankinnat

Helen Ltd: kaikki hankinnat
Julkaistu Hankinta Voittaja Sopimusarvo Tarjouksia
ratkaistu 16.10.2025 Patola (PtB) Ilmavesilämpöpumppu- ja Sähkökattilalaitos, Automaatiojärjestelmä sis. suunnittelun Valmet Automation Oy 749 000 € 2
ratkaistu 28.10.2025 JÄLKI-ILMOITUS Helen Oy:n Patolan sähkökattila- ja ilmavesilämpöpumppulaitos - Säätöventtiilit Valmet Flow Control Oy 499 100 € ei ilmoitettu
ratkaistu 26.6.2025 JÄLKI-ILMOITUS Helen Oy:n Patolan sähkökattila- ja ilmavesilämpöpumppulaitos - Toimilaite- ja käsisulkuventtiilit Toimilaitesulkuventtiilit Oy Konwell Ab 1 776 385 € ei ilmoitettu
ratkaistu 26.6.2025 JÄLKI-ILMOITUS Helen Oy:n Patolan sähkökattila- ja ilmavesilämpöpumppulaitos - Toimilaite- ja käsisulkuventtiilit Käsisulkuventtiilit Oy Konwell Ab 1 504 167 € ei ilmoitettu
POST AWARD NOTICE Helen Ltd's procurement of industrial electrode hot water boilers (Hanasaari production site) Filter Solutions Oü ei ilmoitettu ei ilmoitettu

”Ei ilmoitettu” tarkoittaa, ettei ilmoituksessa ole tätä tietoa erälle tai sopimukselle; hankinnan kokonaisarvo voi silti näkyä ilmoituksen sivulla. Puitesopimuksissa arvo on enimmäisarvo.

Lähde: Hilma (hankintailmoitukset.fi)

Ilmoitus 2023-003624

Ilmoita virheestä tai pyydä poistoa