Aittaluoto Electric Steam Boiler
Pori Energia Oy · alue ei tiedossa
Perustiedot
- Osallistumishakemusten määräaika
- to 30.11.2023 klo 12.00 (päättynyt)
- Kysymysten määräaika
- ma 20.11.2023 klo 12.00 (päättynyt)
- Hankkija
- Pori Energia Oy, Y-tunnus 0790442-4
- Toteutuspaikka
- alue ei tiedossa
- Hankintalaji
- Tarvikkeet ja laitteet (tavarahankinta)
- Menettely
- Neuvottelumenettely, EU-hankinta
- Ilmoituksen tyyppi
- Hankintailmoitus – Erityisalat
- Arvioitu kokonaisarvo
- Ei ilmoitettu
- Pääasiallinen CPV
- 42160000 Kattilalaitteistot
- Lisäkoodit: 31600000, 42162000
- Sopimuskausi
- 20 kuukautta
- Julkaistu
- 12.11.2023
Ammattiala
LVI
Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.
Ilmoituksen teksti
Alkuperäinen teksti Hilmasta, muuttamattomanaPori Energia Oy (later also the Purchaser) is planning to supplement the existing industrial process steam production by purchasing and building a new electric steam boiler plant (later also the Electric Boiler) in their energy generation facility of Aittaluoto Power Plant.
AFRY Finland is acting as a technical consultant on behalf and for the Pori Energia Oy who will be the contracting entity in this procurement.
The Supply shall be consisting of the complete delivery of the functioning Electric Boiler comprising preliminarily:
- Preliminary performance: Approximately 45 MW electric steam boiler having electric power supply of c. 10.5 kV, functioning at the pressure level of c. 20 barg and generating process steam through pressure reduction valve at the level of c. 15 barg
- Project management, design and engineering
- Manufacturing and assembly of all necessary auxiliary equipment with internal piping, valves, pumps, control and instrumentation, electrification and cabling
- Packing and transport to foundation on site in Aittaluoto Power Plant
- Erection and installation
- Startup, commissioning and test-run
- Necessary consumables and spare parts for commissioning
- Documentation and O&M Manual and training
- Possible Options: Electric superheater, zero-load capability, special tools and recommended Spare parts
The Supply shall be compliant with Finnish law and stipulations by Finnish authorities. In addition the design and implementation of the Supply shall meet the EU and Finnish design standards and norms.
Expected timing for the electric boiler taking-over to commercial operation would be latest early summer 2025.
Lisätiedot
Questions should be sent using the Supplier Portal (Tarjouspalvelu). You will also find the answers provided to your questions in the same place.
Hankinnan vaiheet
-
Hankintailmoitustämä ilmoitus
Osallistumishakemuksia pyydettiin, määräaika 30.11.2023 klo 12.00.
-
TulevaJälki-ilmoitus
Ei vielä julkaistu.
Hankkijan aiemmat LVI-alan tarvikehankinnat
Pori Energia Oy: kaikki hankinnatEi jälki-ilmoituksia viimeisen 36 kuukauden ajalta.