Aittaluoto Electric Steam Boiler

Pori Energia Oy · alue ei tiedossa

Perustiedot

Osallistumishakemusten määräaika
to 30.11.2023 klo 12.00 (päättynyt)
Kysymysten määräaika
ma 20.11.2023 klo 12.00 (päättynyt)
Hankkija
Pori Energia Oy, Y-tunnus 0790442-4
Toteutuspaikka
alue ei tiedossa
Hankintalaji
Tarvikkeet ja laitteet (tavarahankinta)
Menettely
Neuvottelumenettely, EU-hankinta
Ilmoituksen tyyppi
Hankintailmoitus – Erityisalat
Arvioitu kokonaisarvo
Ei ilmoitettu
Pääasiallinen CPV
42160000 Kattilalaitteistot
Lisäkoodit: 31600000, 42162000
Sopimuskausi
20 kuukautta
Julkaistu
12.11.2023

Ammattiala

LVI

Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.

Ilmoituksen teksti

Alkuperäinen teksti Hilmasta, muuttamattomana
Pori Energia Oy (later also the Purchaser) is planning to supplement the existing industrial process steam production by purchasing and building a new electric steam boiler plant (later also the Electric Boiler) in their energy generation facility of Aittaluoto Power Plant. AFRY Finland is acting as a technical consultant on behalf and for the Pori Energia Oy who will be the contracting entity in this procurement. The Supply shall be consisting of the complete delivery of the functioning Electric Boiler comprising preliminarily: - Preliminary performance: Approximately 45 MW electric steam boiler having electric power supply of c. 10.5 kV, functioning at the pressure level of c. 20 barg and generating process steam through pressure reduction valve at the level of c. 15 barg - Project management, design and engineering - Manufacturing and assembly of all necessary auxiliary equipment with internal piping, valves, pumps, control and instrumentation, electrification and cabling - Packing and transport to foundation on site in Aittaluoto Power Plant - Erection and installation - Startup, commissioning and test-run - Necessary consumables and spare parts for commissioning - Documentation and O&M Manual and training - Possible Options: Electric superheater, zero-load capability, special tools and recommended Spare parts The Supply shall be compliant with Finnish law and stipulations by Finnish authorities. In addition the design and implementation of the Supply shall meet the EU and Finnish design standards and norms. Expected timing for the electric boiler taking-over to commercial operation would be latest early summer 2025.

Lisätiedot

Questions should be sent using the Supplier Portal (Tarjouspalvelu). You will also find the answers provided to your questions in the same place.

Hankinnan vaiheet

  1. Hankintailmoitustämä ilmoitus

    Osallistumishakemuksia pyydettiin, määräaika 30.11.2023 klo 12.00.

  2. TulevaJälki-ilmoitus

    Ei vielä julkaistu.

Hankkijan aiemmat LVI-alan tarvikehankinnat

Pori Energia Oy: kaikki hankinnat

Ei jälki-ilmoituksia viimeisen 36 kuukauden ajalta.

Lähde: Hilma (hankintailmoitukset.fi)

Ilmoitus 2023-001799

Ilmoita virheestä tai pyydä poistoa