Määräaika päättynyt EU-hankinta SähköTarvikkeet

Pre-qualification for turnkey delivery of main transformer to Nuijala heat station

Fortum Power and Heat Oy · Espoo, Uusimaa

Perustiedot

Osallistumishakemusten määräaika
ti 10.9.2024 klo 12.00 (päättynyt)
Hankkija
Fortum Power and Heat Oy, Y-tunnus 0109160-2
Toteutuspaikka
Espoo, Uusimaa (FI1B1)
Hankintalaji
Tarvikkeet ja laitteet (tavarahankinta)
Menettely
Kilpailullinen neuvottelumenettely, EU-hankinta
Ilmoituksen tyyppi
Hankintailmoitus – Erityisalat
Arvioitu kokonaisarvo
Ei ilmoitettu
Pääasiallinen CPV
31170000 Muuntajat
Sopimuskausi
alkaen 1.11.2024
Julkaistu
17.8.2024

Ammattiala

Sähkö

Ammattiala on Urakkahaun luokittelu. Työn sisältö ratkeaa tarjouspyyntöasiakirjoista.

Ilmoituksen teksti

Alkuperäinen teksti Hilmasta, muuttamattomana
Fortum Power and Heat Oy is building a heat plant in Nuijala, Espoo and the connecting district heating lines to distribute the heat to Espoo district heating network. Heat will be produced by electric boiler which is connected also to a heat accumulator, The heating capacity of the plant is approximately 50 MW (Meg-awatt).The new heat plant shall be ready for commercial operation in the end of 2025. Aim of the tender is for Purchaser to procure a turnkey delivery of main transformer. The preliminary scope of supply comprises of the following ITEM(s) • ITEM 01: one (1) piece of 63MVA oil filled transformer (118/21kV) o Oil filled transformer, with all necessary structures and auxiliaries o with transformer cooling method ONAF or ONAN o Equipment and system design, manufacturing, and delivery o Hauling, installation, testing and commissioning works of transformer at construction site • ITEM 02: Transformer protection cabinet (inc. protection relay) o Including auxiliary, and control cabling from transformer protection cabinet to the existing 20kV switchboard o installation, testing and commissioning works at construction site • ITEM 03: MV-supply cable for 20kV connection between the 63MVA oil filled transformer (ITEM 01) and existing medium voltage switchgear (20kV) o Procurement of material/equipment/devices/work o installation, testing and commissioning works of supply cable at construction site • ITEM 04: 3-phase centerline disconnector o All necessary support structures o Procurement of material/equipment/devices/work o installation, testing and commissioning works of supply cable at construction site • ITEM 05: 110kV cable termination stand. o All necessary support structures o Procurement of material/equipment/devices/work o installation, testing and commissioning works at construction site All ITEM(s) include equipment and system design, manufacturing, and delivery, installation, testing and commissioning works at construction site

Hankinnan vaiheet

  1. Hankintailmoitustämä ilmoitus

    Osallistumishakemuksia pyydettiin, määräaika 10.9.2024 klo 12.00.

  2. TulevaJälki-ilmoitus

    Ei vielä julkaistu.

Hankkijan aiemmat sähköalan tarvikehankinnat

Fortum Power and Heat Oy: kaikki hankinnat

Ei jälki-ilmoituksia viimeisen 36 kuukauden ajalta.

Lähde: Hilma (hankintailmoitukset.fi)

Ilmoitus 2024-012913

Ilmoita virheestä tai pyydä poistoa