DECISION TO SUSPEND PROCUREMENT / 50 MW Electrode boiler 20 kV with main components
Oy Turku Energia - Åbo Energi Ab · Varsinais-Suomi
Perustiedot
- Hankkija
- Oy Turku Energia - Åbo Energi Ab, Y-tunnus 0984944-9
- Toteutuspaikka
- Varsinais-Suomi (FI1C1)
- Hankintalaji
- Tavarahankinta
- Menettely
- Neuvottelumenettely, EU-hankinta
- Ilmoituksen tyyppi
- Jälki-ilmoitus – Erityisalat
- Pääasiallinen CPV
- 44610000 Säiliöt, altaat, astiat ja paineastiat
- Julkaistu
- 1.8.2024
Hankinnan tulos
| Voittaja | Sopimusarvo | Tarjouksia | Päätös |
|---|---|---|---|
| Ei voittajaa: Muu | – | 1 |
Voittajista näytetään nimi ja Y-tunnus. ”Ei ilmoitettu” tarkoittaa, ettei ilmoituksessa ole tätä tietoa erälle tai sopimukselle.
Ilmoituksen teksti
Alkuperäinen teksti Hilmasta, muuttamattomanaThis notice is the suspension notification of the procurement of 50 MW electrode boiler 20 kV with main component.
According to section 116 § of the Act on public contracts in special sectors (1398/2016), the procurement procedure may be
suspended only for a real and justified reason. The provisions of section 114 § concerning the decision on procurement shall
apply to the decision to suspend the procurement procedure.
According to the draft legislation, in assessing the reason for the suspension, the contracting entity must pay attention to whether
the suspension of the procurement procedure is based on real reasons and whether the solution would discriminate against
candidates or tenderers. According to the case law the suspension of a procurement procedure has not been considered to be in
breach of the rules on public procurement, where the suspension was based on real reasons
(ao. KHO 2015 T 861, KHO 2015 T 875).
In the case law and legal literature, the real reasons have been considered to be among other things, that
- not a single tender meeting the requirements of the request for tenders has been received for the procurement
There is a legitimate reason for suspending the procurement for the reasons mentioned above in the legislation. The solution
does not discriminate against suppliers.
Procurement Inroduction:
With this request, Turku Energia Oy was supposed to obtain a delivery of a new electrode boiler with an associated expansion
system, boiler circuit pump, control valves and heat exchanger for Pääskyvuori power station (address: Jaanintie, TURKU,
FINLAND). The aim is to have the boiler in operation by 2026.
Hankinnan vaiheet
-
Osallistumishakemuksia pyydettiin, määräaika 26.1.2024 klo 12.00.
-
Jälki-ilmoitustämä ilmoitus
Hankinta keskeytettiin: Muu.